White House Chronicle

News Analysis With a Sense of Humor

  • Home
  • King’s Commentaries
  • Random Features
  • Photos
  • Public Speaker
  • WHC Episodes
  • About WHC
  • Carrying Stations
  • ME/CFS Alert
  • Contact Us

Beware of the Loving Embrace of the Government

February 26, 2016 by Llewellyn King Leave a Comment

By Llewellyn King

I am not a government-basher per se. As a reporter, I have covered it too long to say the bureaucracy is always incompetent and lazy. But I have also seen how the government wastes money, veers from one project to another, and is indifferent to any damage done by its autocratic ways.

The government, for better or worse, is the great risk-taker on new technologies. As such, it has added immeasurably to the wealth of the nation, from the creation of the technologies that led to the fracking boom and the Internet to the creative advances one now sees in airliners.

After the Pentagon, the Department of Energy (DOE) is the worst offender of the love-it-then-leave-it school of support for technology innovation.

The country is littered with the carcasses of abandoned projects, such as the Yucca Mountain nuclear spent-fuel repository, which was canceled by the Obama administration to please its political ally, Sen. Harry Reid (D-Nev.). Price tag: more than $15 billion.

This cancellation has had two other damaging effects: the first is there is still no permanent place to store nuclear spent fuel, which is piling up in America; and the second is the demoralizing of talented engineers and scientists by the government’s vacillation. These effects may be as huge as the price tag.

Gifted people throw themselves into government projects and move their families across the country to the work sites. Then the government says, “Thanks for your work on the project, but we are canceling it. Now, shove off!” These contractor employees do not have government protections; they are subject to government caprice.

In South Carolina, for example, a huge project to build a plant to blend weapons-grade plutonium into nuclear fuel for civilian reactors is 70-percent completed and hanging by a thread. That is because after spending $5 billion, the DOE wants to do something else equally expensive, according to one consultant.

Or take Gen4 Energy, a small, Denver-based company that has been strung along by the DOE and now is preparing pink slips. Its plan is to build a small (25-MWe), advanced nuclear power plant for use at mining sites, military bases and remote places that need electricity, such as Alaskan villages and those in less-developed countries. These reactors would work for 10 years and then would be swapped out and replaced with a new, factory-built module.

Robert Prince, Gen4 Energy’s CEO, who came out of retirement to lead the advanced reactor project, says it is a unique, safe design using tested materials and concepts. The Gen4 advanced reactor design was in the running for development funding from the DOE.

The DOE uses a device called a “funding opportunity announcement”(FOA), to encourage technology developers. In 2013, it issued an FOA and handed out grants of $1 million each to four advanced reactor designers, including General Electric, General Atomics, Westinghouse and Gen4 Energy.

The DOE’s next step was to issue another FOA. This time, the department planned to split $80 million over 10 years for just two designs, provided the grantees came up with their own $10 million. Gen4 and the others prepared detailed proposals and waited.

In January, the DOE picked two rector designs: one from a consortium that includes Bill Gates and the Southern Company, and the other from technology entrepreneur Kam Ghaffarian. Neither were in the first round.

The DOE decision hit Gen4 Energy particularly hard, as it was the smallest contender and probably the one most in need of DOE help as it labored on its design, which had originated in the Los Alamos National Laboratory and was due for feasibility testing at the University of South Carolina, according to Prince. “We really thought we had a shot,” he said.

Not so. Love from the DOE is a sometime thing. Just ask Prince, who now must tell investors and staff that the $10 million or so they have already spent is gone and the business must pack up, technology abandoned, lives shattered, hope sunk.

Gen4 Energy is not alone in its disappointment. Other companies with exciting designs for reactors are also disappointed. Careers, brilliant ideas, and untold dollars are lost in the way the DOE seduces and abandons people and technologies. — For InsideSources


Email, RSS Follow
Email

Filed Under: King's Commentaries Tagged With: advanced nuclear reactor, Bill Gates, Department of Energy, DOE, Gen4 Energy, General Atomics, General Electric, Kam Ghaffarian, Los Alamos National Laboratory, nuclear reactor, University of South Carolina, Westinghouse, Yucca Mountain

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

White House Chronicle on Social

  • Facebook
  • Twitter
  • Vimeo
  • YouTube
Make Public Broadcasting Great Again by Shaking It Up

Make Public Broadcasting Great Again by Shaking It Up

Llewellyn King

The animus that has led President Trump to order an end to federal funding of PBS and NPR isn’t new. Public broadcasting has been an irritant to conservatives for a long time. Conservatives say public broadcasters are biased against them, especially PBS; they are a kind of ground zero for all things “woke”; and they […]

California Doctor Opens a New Front in Cancer War

California Doctor Opens a New Front in Cancer War

Llewellyn King

In the world of medicine, immunotherapy is a hot topic. It has uses in the treatment of many fatal diseases, even of aging. Simply, immunotherapy is enhancing and exploiting the body’s natural immune system to fight disease. Think of it as being like a martial art, where you use an opponent’s strength against him. Call it medical Judo. Dr. […]

How Trump and Technology Have Turned the Press Corps From Lions to Hyenas

How Trump and Technology Have Turned the Press Corps From Lions to Hyenas

Llewellyn King

Political messaging isn’t what it used to be. Far from it. It used to be that the front pages of The Washington Post and The New York Times were an agenda for action. This power was feared and used by successive presidents in my time, from Lyndon Johnson to Joe Biden, but not by Donald Trump. […]

Rare Earths Are a Crisis of Government Neglect

Rare Earths Are a Crisis of Government Neglect

Llewellyn King

An old adage says “a stitch in time saves nine.” Indeed. But it is a lesson seldom learned by governments. As you struggle through TSA screening at the airport, just consider this: It didn’t have to be this way. If the government had acted after the first wave of airplane hijackings in the early 1960s, we […]

Copyright © 2025 · White House Chronicle Theme on Genesis Framework · WordPress · Log in